Skip to content
7:00am – 7:00pm, seven days
NL-4417JoondalupMarch 2026

Ceramic fuse board out, RCDs in

A 1979 board with fuse wire and no safety switches, replaced in a day with RCBOs on every circuit and six spare ways.

Filed under Switchboard upgrades.

Suburb
Joondalup
Job
Full board replacement
Circuits
11, plus 6 spare ways
Power off
4 hrs 40 min
On site
One day
Certificate
Issued same day
JoondalupNL-4417
Schematic of a switchboard enclosure: a main switch, a busbar, six residual current breakers on a DIN rail with one tripped, and the earth bar below.MAINC1C2C3C4C5C6

What happened

The call

The owners had been quoted for a home battery and been told, almost in passing, that the switchboard would need doing first. They rang us for a second opinion, half expecting to be told the same thing by someone else with something to sell.

The board was original to the 1979 house. Ceramic fuses with fuse wire, a main switch with a cracked bakelite handle, and nothing anywhere on it resembling a test button.

What we found

Nothing had failed. That was rather the point

There was no fault to find. Everything in the house worked. What the board did not have was any residual current protection at all, which meant that in forty-six years nothing in that house had ever been protected against a person becoming part of the circuit.

Testing the existing circuits before quoting turned up one genuine surprise: the insulation resistance on the rear lighting circuit was well down, traced to a perished section of cable above the laundry where a previous roof leak had sat on it. That circuit was a fault waiting for a wet winter, and the old fuse would never have detected it.

The main earth was a stake driven beside the meter box with no visible bonding to the water service, which was also original and metallic.

What we did
  • New surface-mount enclosure, weather-rated, replacing the recessed 1979 board
  • RCBOs on all eleven final subcircuits — one device per circuit
  • New main earth conductor, replacement earth stake and water service bonding
  • Damaged section of rear lighting cable cut out and replaced above the laundry
  • Six spare ways left free and pre-labelled for a battery, an EV charger and a future aircon
  • Circuit schedule printed, laminated inside the door and emailed as a PDF
How it ended

The house went from no residual current protection at all to a device on every circuit, and one genuinely dangerous cable came out of the roof on the way through.

The battery quote the owners were originally chasing is still on the table. When they go ahead with it, the board is ready and there is no second bill.

Job ticketNL-4417
  1. Arrived, isolation agreed

    Walked the house with the owners and confirmed what would be off and for how long.

  2. Supply isolated

    Main switch off, circuits proved dead, temporary lead run for the fridge.

  3. Old board out

    Existing board removed, all circuits identified, labelled and tested individually.

  4. Fault found on rear lighting

    Low insulation resistance traced to water damage above the laundry. Quoted on the spot.

  5. New enclosure mounted

    Board mounted, mains terminated, earthing and bonding renewed.

  6. Damaged cable replaced

    Perished section cut out and replaced in the roof space before energising.

  7. Circuits reconnected

    All eleven circuits landed on their own RCBOs and labelled.

  8. Power back on

    Supply restored. Total outage four hours and forty minutes.

  9. Tested and certified

    Trip times measured on every device, schedule fitted, certificate issued.

What they said afterwards

  • 5 out of 5

    Rang at nine on a Sunday night expecting a message bank and got an actual electrician. He talked me through turning the right breaker off over the phone so we could sleep, then turned up first thing Monday. Ended up replacing the whole board, and the price he said on Monday morning was the price on the invoice.

    Mark D.Joondalup · March 2026Read the job this refers to

No power right now

Tell us what it is doing and we will tell you what it costs.

We text when we are on the way, and you get the price before we start.

7:00am – 7:00pm, seven days · EC 13927